SEFAKÖY HEPP
Name of the Project: SEFAKÖY HEPP
Employer : PURE ENERJİ AŞ ( GÜLSAN GRUP )
Contractor : ENERDEN ENERJİ LTD ŞTİ
Place of Construction: Kağızman / KARS
Installed Power: 2 x 17,5 MW
Electro mechanic Equipment: Vertical type Francis turbine + Generator
Scope of Work:Material supply, Transportation, Montage, Tests , Commissioning
- Turbines, generators, speed regulators, inlet valves
- AG, OG, automation systems
- 10.5 /33kV step-up transformer
- 10.5 and 36 Kv Shut Panels
- Central Mechanic Auxiliary Systems
- Central Sanitary System, Fire Protection, HVAC Systems
- Central and Forebay Pool Secondary Protection, Command and Control Systems
- Intake Structure Command and Control Systems
- Central AC-DC Auxiliary Service Systems
- 34.5 Kv Transmission Line Connection