SEFAKÖY HEPP

Name of the Project:  SEFAKÖY HEPP

Employer : PURE ENERJİ AŞ ( GÜLSAN GRUP )

Contractor : ENERDEN ENERJİ LTD ŞTİ

Place of Construction: Kağızman / KARS

Installed Power: 2 x 17,5 MW

Electro mechanic Equipment: Vertical type Francis turbine + Generator

Scope of Work:Material supply, Transportation, Montage, Tests , Commissioning

  • Turbines, generators, speed regulators, inlet valves
  • AG, OG, automation systems
  • 10.5 /33kV step-up transformer
  • 10.5 and 36 Kv Shut Panels
  • Central Mechanic Auxiliary Systems
  • Central Sanitary System, Fire Protection, HVAC Systems
  • Central and Forebay Pool Secondary Protection, Command and Control Systems
  • Intake Structure Command and Control Systems
  • Central AC-DC Auxiliary Service Systems
  • 34.5 Kv Transmission Line Connection