KALETEPE HEPP

Name of the Project:  KALETEPE HEPP

Employer : KAYEN ALFA ENERJİ AŞ ( KAYI GRUP )

Contractor : ENERDEN ENERJİ LTD ŞTİ

Place of Construction: Tortum / ERZURUM

Installed Power: 2 x 5 MW

Electro mechanic Equipment: Horizontal type Francis turbine + Generator

Scope of Work:  Material supply, Transportation, Montage, Tests , Commissioning

  • Turbines, generators, speed regulators, inlet valves
  • AG, OG, automation systems
  • 6.3/33kV step-up transformer
  • 6.3 and 36 Kv Shut Panels
  • Central Mechanic Auxiliary Systems
  • Central AC-DC auxiliary service systems
  • 34.5 Kv transmission line connections